Free beta access. 50 free AI tokens each week. Optional top-ups available. See what is included
Opening Word document…

Energy Beaming would require 10,000 launches

National Research Council et al 81 (Electric Power From Orbit: A Critique of a Satellite Power System, 6, 6-25-11, AH)

The construction of the SPS satellites would require the development of a complex system of space transportation, both for materials and for space workers. The first stage of transportation, from earth to LEO, would require the development of a heavy lift launch vehicle (HLLV) that would be reusable. The reference system postulates the development of an HLLV capable of carrying about 400 metric tons. Since these vehicles would have to carry about 4 million metric tons of materials from earth to LEO over a period of 30 years, it would be necessary to construct a fleet of 40 to 50 HLLVs to make more than 10,000flights, an average of more than one HLLV launch per day.

Sign in to recut, update, or save this card.