Free beta access. 50 free AI tokens each week. Optional top-ups available. See what is included
Opening Word document…

Nuclear reactor operating cost and construction cost is highly expensive

Office of Nuclear Energy 2021

[3-29-2021, Office of Nuclear Energy, “Advantages and Challenges of Nuclear Energy”, , accessed 7-9-2023, AS]

USED FUEL TRANSPORTATION, STORAGE AND DISPOSAL Many people view used fuel as a growing problem and are apprehensive about its transportation, storage, and disposal. DOE is responsible for the eventual disposal and associated transport of all commercial used fuel, which is currently securely stored at 76 reactor or storage sites in 34 states. For the foreseeable future, this fuel can safely remain at these facilities until a permanent disposal solution is determined by Congress. DOE is currently evaluating nuclear power plant sites and nearby transportation infrastructure to support the eventual transport of used fuel away from these sites. It is also developing new, specially designed railcars to support large-scale transport of used fuel in the future. CONSTRUCTING NEW POWER PLANTS Building a nuclear power plant can be discouraging for stakeholders. Conventional reactor designs are considered multi-billion dollar infrastructure projects. High capital costs, licensing and regulation approvals, coupled with long lead times and construction delays, have also deterred public interest. DOE is rebuilding its nuclear workforce by supporting the construction of two new reactors at Plant Vogtle in Waynesboro, Georgia. The units are the first new reactors to begin construction in the United States in more than 30 years. The expansion project will support up to 9,000 workers at peak construction and create 800 permanent jobs at the facility when the new units begin operation in 2023. DOE is also supporting the development of smaller reactor designs, such as microreactors and small modular reactors, that will offer even more flexibility in size and power capacity to the customer. These factory-built systems are expected to dramatically reduce construction timelines and will make nuclear more affordable to build and operate. HIGH OPERATING COSTS Challenging market conditions have left the nuclear industry struggling to compete. DOE’s Light Water Reactor Sustainability (LWRS) program is working to overcome these economic challenges by modernizing plant systems to reduce operation and maintenance costs, while improving performance. In addition to its materials research that supports the long-term operation of the nation’s fleet of reactors, the program is also looking to diversify plant products through non-electric applications such as water desalination and hydrogen production. To further improve operating costs. DOE is also working with industry to develop new fuels and cladding known as accident tolerant fuels. These new fuels could increase plant performance, allowing for longer response times and will produce less waste. Accident tolerant fuels could gain widespread use by 2025.

Sign in to recut, update, or save this card.